Deposits
Charges for installation of meters include labor, equipment and materials and overhead.
An estimate of installation charges will be determined by the Utility and a deposit in that amount will be required prior to commencement of installation.
In the event the estimated charge is more than the actual cost of installation, the applicant will receive a refund. Should the deposit be less than the actual installation cost, the applicant will be billed for the additional charges.
| Meter Size | Total Deposit |
|---|
| 3/4" or 1" | $6,000 |
| 2" | $7,500 |
| 4" | $10,000 |
| 6" | $12,000 |
There is a fee for a water service disconnection from the mainline deposit. Charges for disconnection include labor, equipment and materials and overhead.
An estimate of installation charges will be determined by the Utility and a deposit in that amount will be required prior to commencement of installation.
In the event the estimated charge is more than the actual cost of installation, the applicant will receive a refund. Should the deposit be less than the actual installation cost, the applicant will be billed for the additional charges.
Water Disconnection from the Mainline (Deposit): $5,000