| W-0 | Water Standard Index List | May 30, 2013
|
| W-1 | 3/4" x 1" OR 1" service assembly | August 18, 2021 |
| W-2 | 1 1/2" or 2" water service assembly | August 18, 2021 |
| W-3 | 3" & 4" meters with 2" by-pass | February 27, 2020 |
| W-4 | 6" & 8" meters with 2" by-pass | February 27, 2020 |
| W-5 | Standard Main Testing and Disinfecting | January 12, 2011 |
| W-6 | Typical trench detail | May 9, 2006 |
| W-7 | Thrust Blocks | March 22, 2005 |
| W-8 | Pipe support | March 22, 2005 |
| W-9 | Pipe concrete encasement | March 22, 2005 |
| W-10 | Valve assembly, box, cover Identification and valve stem extension | August 10, 2021 |
| W-11 | Fire hydrant assembly | August 10, 2021 |
| W-12 | Fixed post barrier | March 22, 2005 |
| W-13 | 2" Blow-Off assembly | October 15, 2012 |
| W-14 | Air and vacuum assembly (1" & 2") | February 8, 2021 |
| W-15 | Backflow prevention assembly Double check valve | July 14, 2020 |
| W-16 | Water and sewer separation | July 14, 2020 |
| W-17 | 4" Blow-Off Assembly | October 11, 2012 |
| W-18 | 4" Combination Air Vacuum and Air Release Valve Assembly | March 9, 2021 |
| W-19 | Water Utility Spacing & Clearances | April 14, 2016 |
| W-20 | ALW Valve Can Cover Color Code Chart | June 2. 2021 |
| W-21 | Meter Manifold Assembly | August 16, 2021 |
| W-22 | Ductile Iron Class 350 Pipe | August 18, 2021 |
| ALW | General Notes | July 22, 2021 |