Projects

Search for the most up to date project information https://apps.ncdot.gov/traffictravel/progloc/ProgLocSearch.aspx

Projects Under  Construction

NC 43 Connector

STIP Number R-4463A

Construction is underway to build the final phase of the NC 43 Highway in Craven County. Construction will join the current highway at US 70 with Highway 17 Business in New Bern along a new route. The new section will be a four lane, median divided highway with signalized intersections and interchange improvements throughout. 

US 70 Improvements - "C" Section

STIP Number R-5777C 

Construction is underway to upgrade US 70 to interstate standards from the Havelock Bypass to the James City Project. 

US 70 Improvements - James City

STIP Number U-5713, R-5777A, R-5777B

Construction is underway to improve local and highway traffic on the 5 mile stretch of James City. The project will convert the conventional intersections to interchanges with highway exits for future Interstate 42. 

Hotel Drive Safety Improvements

The intersection of Hotel Drive and US 17 Business (Dr. MLK Jr. Blvd) has construction underway to modify the current full movement intersection to a "thru-cut" intersection due to a high number of crashes. Once construction is complete, drivers will not be able to go straight across Hotel Drive. Construction began this summer and is expected to be completed by the Fall. 

Projects In Development

Miller Boulevard Widening

STIP Number U-3441

Planning and development are underway to widen Miller Boulevard and NC 101 in Havelock to four lanes with a raised median. The project aims to alleviate congestion, add capacity, and improve safety along the corridor. 

Completed Projects

US 70 Improvements - Havelock Bypass

STIP Number R-1015

Construction was completed in December 2025 of the Havelock Bypass. The bypass is a four lane, median divided high speed highway which serves as an alternate route to using US 70 through Havelock. 

Glenburnie Road Sidewalk Installation

In 2025, a small portion of Glenburnie Road from College Court to Greenbrier Parkway had sidewalks installed to improve connectivity from Craven Community College to nearby neighborhoods. 

Neuse Boulevard Pedestrian Facilities

In 2024, multiple intersections along Neuse Boulevard received pedestrian improvements with the installation of push buttons and crosswalks.