Prioritization

Prioritization Process

The Prioritization process is the North Carolina Department of Transportation (NCDOT) data-driven method for prioritizing transportation investment decisions and is used to develop the State Transportation Improvement Program (STIP). Potential improvement projects are submitted to NCDOT to be scored and ranked at the state, regional and division levels based on criteria in categories of safety, congestion, cost-benefit, and local priorities. The scores are used to determine if a project receives funding. The STIP is required by federal law to be developed every 4 years. Each STIP covers a 10 year time frame during which NCDOT works on the included projects. Prioritization considers transportation projects in the categories of aviation, bicycle and pedestrians, ferry, public transit, rail, and roadways. Each cycle involves submitting projects for ranking and scoring then assigning local input points to influence final project score. 

The MPO was given 10 submittal slots per mode; 10 projects were submitted for highway, 10 for aviation, and 6 for bicycle & pedestrians. Specific details regarding the project are included below. 

Route To  From Improvement Type
US 17 BUS  Walmart driveway     Intersection improvement
US 17 BUS US 70 West Bound Off Ramp      Add turn lane
NC 55 (Neuse Blvd.) SR 1309 (Glenburnie Rd.) First St.  Convert to road diet
SR 1215 (Simmons St.) Trent Rd.  NC 55 (Neuse Blvd.) Convert to road diet
SR 1309 (Glenburnie Rd.) US 17 BUS US 70  Implement access management
Trent Rd.  US 17 BUS SR 1215 (Simmons St.) Convert to road diet
SR 1309 (Glenburnie Rd.) US 70 East Bound Off Ramp US 70 West Bound Off Ramp Add turn lane
US 17 BUS Lowes Blvd.     Intersection improvement
SR 1309 (Glenburnie Rd.) Amhurst Blvd. Elizabeth Ave. Implement access management
NC 55 (Neuse Blvd.) Race Track Rd.      Intersection improvement

Submit Local Input

The prioritization process is primarily based on data such as crashes, time savings, project length, cost and various other factors. It also considers local input! If locals believe one project should be a higher priority than another, the MPO can submit to add points to the project. Each MPO, RPO, and Division across the State is given a certain amount of points that can be applied to the projects in its area. If a project receives enough points and scores well enough, it may be eligible for project funding. 

Take the survey to prioritize the projects: https://publicinput.com/nbampo-p8

View the NCDOT Prioritization Map: https://ncdot.publicinput.com/p8map

Schedule of milestones in the P8 process spanning 2024 to 2027