| Scour Critical Bridges Coding |
Last Updated |
|
FHWA SNBI B.AP.03 Scour Vulnerability Ratings
See Hydraulic Vulnerability Manual – Section 7 - Scour Vulnerability and Plan of Action
|
August 2026 |
| FHWA Specifications for National Bridge Inventory (SNBI) |
August 2026 |
| Plan of Action (POA) |
Last Updated |
| FHWA Scour Critical Bridge POA Template (Word version available) |
June 2017 |
| FHWA NBIS POA for Scour Critical Bridges memo |
March 2005 |
| FHWA POA Website
Includes links for: FHWA Hydraulic Engineering Circular 23,
FHWA Plan of Action Training
|
June 2017 |
| NYSDOT - Fillable POA Template |
August 2026 |
| Sample of Completed NYSDOT POA |
August 2026 |
| Monitoring Program References |
Last Updated |
NYSDOT Bridge Flood Warning Report
See Hydraulic Vulnerability Manual – Form 8.1 Flood – Watch Log |
August 2026 |
| NYSDOT Hydraulic Vulnerability Manual at Bridge Crossings
Section 8 – Flood-Watch Program (Used by NYSDOT on State bridges)
Section 9 – Post-Flood Inspections (Used by NYSDOT on State bridges)
|
August 2026 |
| Post Flood Inspection Template |
Last Updated |
| Post Flood Inspection Report Template |
August 2026 |