Untitled Document

Department of Transportation

Print Print Page     Font Adjust Font Size

 

Engineering Division -
Office of Structures

Structure Management Bureau

Plan of Action for Scour Critical Bridges

Contact Information :
Derek Intschert, P.E.
Hydraulic Engineering Unit
NYSDOT - Office of Structures
50 Wolf Road Albany, NY 12232
E-Mail: Derek.Intschert@dot.ny.gov
Phone: (518) 485-7265

NYSDOT Regional Local Project Liaisons - Contact Info

 

Scour Critical Bridges Coding Last Updated

FHWA SNBI B.AP.03 Scour Vulnerability Ratings
See Hydraulic Vulnerability Manual – Section 7 - Scour Vulnerability and Plan of Action

August 2026
FHWA Specifications for National Bridge Inventory (SNBI)  August 2026
Plan of Action (POA) Last Updated
FHWA Scour Critical Bridge POA Template (Word version available) June 2017
FHWA NBIS POA for Scour Critical Bridges memo  March 2005
FHWA POA Website 
Includes links for: FHWA Hydraulic Engineering Circular 23,
FHWA Plan of Action Training
June 2017
NYSDOT - Fillable POA Template  August 2026
Sample of Completed NYSDOT POA August 2026
Monitoring Program References Last Updated
NYSDOT Bridge Flood Warning Report
See Hydraulic Vulnerability Manual – Form 8.1 Flood – Watch Log
August 2026
NYSDOT Hydraulic Vulnerability Manual at Bridge Crossings
Section 8 – Flood-Watch Program (Used by NYSDOT on State bridges)
Section 9 – Post-Flood Inspections (Used by NYSDOT on State bridges)
August 2026
Post Flood Inspection Template Last Updated
Post Flood Inspection Report Template August 2026